During the second week they found another evening to finish up some of the little things.Switches all installed.
And I have a stereo again.
Brandon under the truck figuring out how to install the tank drain.
This was harder than they thought.
Believe me that floor was cold and hard but after this day there was very little left to do.
Sunday, April 6, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment